Vilniaus m. sav., Kalnėnai, Gurių g.
New project
-
Object typeNew project
-
Total area28.00 m²
-
Reference
About this property
“Forest Hill Kalnėnai” is a cozy complex of residential buildings, thought out to the smallest detail, in the green part of Kalnėnai. Four three-story houses will find their place next to the Ribiškės Landscape Reserve. Only 71 apartments – for those who value privacy, peace and quality neighborhood. We offer new residents 1 and 4-room apartments, the areas of which range from 28 to 76 m². Each apartment has a balcony or terrace, allowing you to enjoy the pleasant environment every day. “Forest Hill Kalnėnai” was created with those who are looking for peace, harmony with themselves and the environment, and modern comfort in mind. Construction is scheduled for completion in the fourth quarter of 2027.
MAIN ADVANTAGES • Strategically convenient location, ensuring quick access to both the city center and other city districts; • Small, cozy complex of only 71 apartments in 4 houses; • Low-rise (3-story) construction; • Nearby you will find nature for both active sports and quiet walks, and the little residents will have the opportunity to play safely in the courtyard; • A++ energy class, economical underfloor heating; • All apartments will have balconies, and the residents of the first floor will be able to enjoy comfortable terraces and private courtyards; • Each apartment has the opportunity to purchase a parking space in an underground or above-ground parking lot next to the house; • There is an opportunity to purchase a storage room; • Excellent price, space and quality ratio.
TECHNICAL CHARACTERISTICS • Foundations: Bored piles. Diameter D400, depth 4000-6000mm. • Walls: External walls of the underground parking lot – monolithic, 250 mm wide, waterproofed from the outside, insulated with 50 mm polystyrene foam EPS100. Internal walls of the underground part of the parking lot, heated rooms – masonry, 250 mm wide. External and internal walls of the above-ground part – masonry. External and internal walls of the above-ground part – masonry. • House decoration: Facade walls – masonry blocks (250 mm thick), covered with clinker tiles and WPC siding. • Roof: Roof base – prefabricated perforated ceiling panels. Vapor barrier polyethylene film (200 mkr). Insulation layer – polystyrene foam EPS80. Top waterproofing layer – bitumen roof coating (2 layers). • Windows: Apartment window frame profile – plastic (PVC). Double-glazed window with two selective glasses. • Staircase windows - plastic (PVC). • Doors: Entrance doors of aluminum glass structures. Apartment doors - panel armored doors. • Interior partitions: Inter-apartment, load-bearing partitions - 250mm., brick. Apartment partitions - plasterboard systems 100mm., partitions. • Ceilings: Reinforced concrete hollow prefabricated ceiling panels. Inter-storey 220mm. • Stairs Prefabricated reinforced concrete U-shaped stairs. • Floors Parking floor - industrial, polished concrete floor. Inter-storey ceiling floor - reinforced sand concrete layer. Staircase - reinforced sand concrete layer with tile covering. The floors of the apartment sanitary units are not concreted, leaving the possibility of changing the water supply/wastewater outlets when installing the sanitary units. • Sewerage: D100 plastic pipes are used for toilets, D50 for sinks, bathtubs and shower cabins. In the sanitary units, the buyer will have the opportunity to change the locations of the outlets. Wastewater is disposed of through the centralized Vilnius city water networks. • Ventilation The buyer will have to install recuperation. The possibility of connecting the suction through the opening in the facade will be left in the external walls, and the exhaust pipelines to the roof in the ventilation shafts. The installation locations of the recuperators are provided in the sanitary units - in the ceilings. Recuperation ducts are not laid out. The recuperator is not installed by the builder. • Water supply: Hot water is supplied from the Vilnius city heating networks, cold water is supplied from the Vilnius city water networks. Water is supplied to the apartments through d20-d50 plastic pipes. Hot and cold water pipes are brought to the sanitary units and kitchen areas provided for in the project. • Electrical installation: An input cable is brought to the apartment's electrical panel, the buyer installs the rest of the installation. The panel will have: 1 three-phase: input 4 single-phase: for lighting, sockets, collector, communication panel. • Fire alarm installation: A type GAS system is designed in an underground parking lot. Addressable smoke detectors are provided in common areas, autonomous ones in apartments. An audible siren with a flash is provided outside. • Security alarm installation: The buyer installs according to needs. • Internet and TV cables: The buyer installs according to needs. Inputs in apartments at the main entrance doors. • Heating: The heating source of the object is Vilnius city heating networks. Heat is supplied through main pipelines. A heat point is provided in the basement. Common areas are heated by electric radiators. Apartments - underfloor heating (d18 pipes). Apartment metering will be in the stairwell, on each floor. Introductory heating point - in the parking lot. • Electricity: Electricity is supplied through centralized electricity networks (ESO) • Gas: Gas pipeline not included in the project